– East London. March 2014.

– Design and fabrication of stainless steel sorting table.

– Creation of wash down area.

– Installation of guard rails.

– Application of anti-slip flooring.

Leave a Reply

Your email address will not be published. Required fields are marked *

Fill out this field
Fill out this field
Please enter a valid email address.
You need to agree with the terms to proceed

Menu