– Upper Bank Street East London. May 2015.
– Removal existing surfacing.
– Shot Blasting of existing deck.
– Application of Water proofing.
– Resurfacing with mastic asphalt.
– Line Marking.
– Upper Bank Street East London. May 2015.
– Removal existing surfacing.
– Shot Blasting of existing deck.
– Application of Water proofing.
– Resurfacing with mastic asphalt.
– Line Marking.