– Upper Bank Street East London. May 2015.

– Removal existing surfacing.

– Shot Blasting of existing deck.

– Application of Water proofing.

– Resurfacing with mastic asphalt.

– Line Marking.

Leave a Reply

Your email address will not be published. Required fields are marked *

Fill out this field
Fill out this field
Please enter a valid email address.
You need to agree with the terms to proceed

Menu